The First Long Bridge Opens to Traffic, Sudan President Cuts the Ribbon
  Date:2011-07-08  Visits:

The first long bridge inwas open to traffic on the morning of the 7th of July local time, andPresident cut the ribbon himself at the opening ceremony.

is located aboutsouth of, just on,long andwide. This bridge is the key project in, construction and design cost is US$ 35,800,000, and contract period is 30 months. It is the first long bridge in.

The bridge was joined two sections in advance on December 10th, 2010, and completed on March 10th, 2011, passed the acceptance check on May 21st, and achieved Bridge Construction Excellence on May 24th.

 

 

 

Produced By 大汉网络 大汉版通发布系统